(തിരുവനന്തപുരത്ത് നടന്ന അപകടകാരണത്തെ കുറിച്ചല്ല, പൊതുവായാണ് ഈ കുറിപ്പ്)
excavations to a depth of more than 1.5 metres is involved,-
(1)In the case of constructions/land developments which involve any
earthwork excavation to a depth of more than 1.5 metres, if the depth
of cutting is more than the horizontal distance of such cutting from the
plot boundary, the following provisions shall apply:
such excavation is carried out for construction of structures such
as wells, septic tank, recharge pits, drainage works, compound
walls and the like.
submitted by the applicant as per the provisions of these rules,
along with a certificate of the Architect, Building Designer,
Engineer, Town Planner, Supervisor as the case may be, who
has prepared and signed the plans, drawings, statements etc. as
to whether permit as envisaged under rule 11A is required.
the levels and depths of cutting at all places in respect of
excavations for building construction and land
development works,
permanent protective measures proposed and
columns, retaining walls etc. proposed at the ground
floor level and below.
specifications, erection methods and the like.
Provided that, if any changes or deviations are to be
made, it shall satisfy the provisions of these rules and the same
shall be intimated to the Secretary with revised drawings,
specifications and details as the case may be.
permit(s) from owners or occupants in the adjoining properties
on the actual or possible damages to their life and property shall
be acted upon by the Secretary as per the provisions in this rule.
are completed as per the approved plans, the applicant may in
writing intimate the same to the Secretary and request for
concurrence for carrying out rest of the works. No construction
shall be carried out above the ground level until the Secretary
issues such concurrence as in Appendix C1.
satisfactorily as per the permit(s) and provisions of this rule and
no written complaint is received as in sub rule (5), issue
concurrence as in Appendix C1 for carrying out the remaining
works above the ground level as per approved plans within 7
days after intimating the completion of works upto ground level.
shall:
(i) refer the matter within 5 days to the Technical Expert
Committee constituted as per sub rule (12) and convene
a meeting of the Committee;
(ii) intimate the nature of complaints to the applicant and
call for details and explanation if so desired by the
Committee;
(iii) arrange for site inspections, hearing of the applicants
and/or petitioners, verification of records and arrange for
tests if so required by the Committee and
(iv) take up further action as per the recommendations of the
Committee.
and shall also produce any details called for within the time
specified, if so required by the Committee or the Secretary on its
behalf.
compensation and/or suggest further protective measures, if
any, to be taken by the applicant to solve the issues raised by
the petitioner(s). The amount of compensation shall include the
actual cost of restoration as decided by the Committee and an
additional 30% as solatium:
completed within a total duration of 3 weeks.
the protective measures are carried out to the satisfaction of the
Committee and the compensation is paid by the applicant as per
the decision of the Committee. The actual expenses of the
Committee as intimated by the Secretary shall be paid by the
applicant.
municipal level Technical Expert Committee(s) comprising of the
Secretary (convener), Municipal Engineer/Town Planning Officer
and two experts, one each in Structural Engineering and
Geotechnical Engineering (to be nominated by the Government)
to assess the damage, suggest protective measures and fix the
compensation.